The first of our interior walls have been constructed and installed. In the photos below, you can see that Scott’s desk area has been formed inside the bedroom.
In the lower photos, you can see the bed frame/pedestal has also been installed. The bed pedestal is a plywood platform that sits on a frame and is hinged with air pistons that help with raising and lowering the platform. This allows us to store a LOT of stuff below the bed.



The shower curtain is surrounding the shower pan and will eventually be enclosed in walls and the toilet sits directly across from the shower. There will be many more walls as we work our way forward. At this writing, the shower and the toilet are both fully operational.









